https://www.malaymail.com/s/1692809/mb-says-third-johor-singapore-bridge-to-start-2019
If construction of the new crooked bridge really starts next year, it will mean that the causeway on Malaysia side will be dismantled in the future and this will include the water pipes that link to SG.
What is SG government going to do about it?
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment